Is a leading manufacturer of metal wall cladding metal roofing ceilings perimeter edge metal and accessories.
Metal roof overhang drip edge.
Install sheet metal drip cap over the lower rim.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
How where should it be installed on roof eaves gable ends.
Founded in 1963 atas international inc.
The extension should be at least inch for it to work.
Roof drip edge is important for proper roof installation to avoid leaks and to give a straight edge to the roof eaves and gable ends.
If this slight overhang is too short water will drip behind the gutters leading to rotted roof sheathing and fascia stained siding and even soil erosion and a flooded basement.
A typical metal roof overhang may be 2 to 4 inches or even less.
How to install drip edge.
The lower edge of a roof should extend beyond the fascia board by about 3 4 inch so that runoff drains into the gutters.
Roof drip edge specifications are given here.
Roof underlayment requirements over drip edge.
Once free slide the drip edge out and discard.
Step by step install drip edge on a metal roof build the lower rim of roof extended away from the fascia.
Some slight overhang is recommended in conjunction with a drip edge flashing to prevent water from getting under the roofing and onto underlying wood.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.